2020 Grand Design 320G 5th wheel
The 300Ah battery and MultiPlus 3000 were installed in the forward storage compartment after removing the standard lead acid batteries.
We installed a manual switch to enable both sides of the customers 50A panel to be powered when running on the inverter. The manual switch is a cost effective alternative to a Smart Phase Selector. Extra wire length was left to enable later fitment of an SPS if needed later.
A BMV-712 battery monitor and Digital Multi Control (MultiPlus control) were installed local to the other gauges and control panel.
We installed a manual switch to enable both sides of the customers 50A panel to be powered when running on the inverter. The manual switch is a cost effective alternative to a Smart Phase Selector. Extra wire length was left to enable later fitment of an SPS if needed later.
A BMV-712 battery monitor and Digital Multi Control (MultiPlus control) were installed local to the other gauges and control panel.